FAP 5 over MUDDY CREEK

1 MI N OF MISSISSIPPI · County 109, Tennessee · Built 1980 · 4 Lanes · 10,957 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
55SR0050021
Year Built
1980
Length
9 m (29.5 ft)
Max Span
3.8 m
Width
89.6 m (294 ft)
Lanes
4
Daily Traffic
10,957
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$295,000
Total Project Cost
$443,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.