FAP 5 over MUDDY CREEK

1.2 MI.N.OF MISS.ST.LINE · County 109, Tennessee · Built 1997 · 5 Lanes · 10,957 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
55SR0050001
Year Built
1997
Length
46.3 m (151.9 ft)
Max Span
15.7 m
Width
26.2 m (86 ft)
Lanes
5
Daily Traffic
10,957
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,748,000
Total Project Cost
$2,623,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.