I75 NBL over NFA 2327

16.3 MI.FROM BRADLEY CO. · County 107, Tennessee · Built 1971 · 2 Lanes · 41,537 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54I00750025
Year Built
1971
Length
53.3 m (174.9 ft)
Max Span
23.8 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
41,537
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.