FAS 305 over NORTH MOUSE CREEK

EAST OF I75 · County 107, Tennessee · Built 1977 · 2 Lanes · 8,451 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54011910001
Year Built
1977
Length
34.4 m (112.9 ft)
Max Span
17.4 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
8,451
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.