I40 over N. FORK BIG BEAVER CREEK

2 MI N POPLAR CORNER RD · County 077, Tennessee · Built 1965 · 4 Lanes · 32,747 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
39I00400009
Year Built
1965
Length
8.4 m (27.6 ft)
Max Span
3.7 m
Width
44.6 m (146.3 ft)
Lanes
4
Daily Traffic
32,747
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$293,000
Total Project Cost
$440,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.