FAP 22 over BRITT CREEK

1 M CARROLL-HENDERSON C L · County 077, Tennessee · Built 1998 · 5 Lanes · 8,483 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
39SR0220023
Year Built
1998
Length
20.7 m (67.9 ft)
Max Span
6.5 m
Width
31.5 m (103.3 ft)
Lanes
5
Daily Traffic
8,483
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$714,000
Total Project Cost
$1,072,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.