FAU 8SB RP TO SR29 over NFA A029 & SOU RR

1.1 MI FROM TN RIVER · County 065, Tennessee · Built 1958 · 2 Lanes · 23,097 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
33SR0080013
Year Built
1958
Length
100.3 m (329.1 ft)
Max Span
37.8 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
23,097
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$146,000
Total Project Cost
$220,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.