FAP 29 RAMP over SR8 SB RP TO SR29

1.68 MI. N OF TENN. RIVER · County 065, Tennessee · Built 2014 · 2 Lanes · 48,148 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
33FA0271009
Year Built
2014
Length
40.5 m (132.9 ft)
Max Span
40.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
48,148
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$54,000
Total Project Cost
$82,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.