I75 SBL over SR 2 BONNEY OAKS DR

5.2 MI I75 SR153 IC · County 065, Tennessee · Built 2004 · 4 Lanes · 99,576 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
33I00750060
Year Built
2004
Length
63.4 m (208 ft)
Max Span
38.7 m
Width
21.6 m (70.9 ft)
Lanes
4
Daily Traffic
99,576
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.