I75 over SR 317 - BONNEY OAKS DR

5.2 MI FM I75 SR153 IC · County 065, Tennessee · Built 2004 · 6 Lanes · 99,576 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

35.059303, -85.130942

This bridge is in worse condition than 56.3% of bridges in County 065. The average bridge in Tennessee is 0 years old; this one is 22 years old.

Nearby Bridges

Bridge Details

Structure #
33I00750059
Year Built
2004
Length
63.4 m (208 ft)
Max Span
38.8 m
Width
35.4 m (116.1 ft)
Lanes
6
Daily Traffic
99,576
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.