FAP 34 over JOCKEY CREEK

AT WASHINGTON CO LINE · County 059, Tennessee · Built 1998 · 2 Lanes · 12,379 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
30SR0340028
Year Built
1998
Length
68 m (223.1 ft)
Max Span
22.8 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
12,379
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$124,000
Total Project Cost
$187,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.