FAP 34 over JOCKEY CREEK

AT WASHINGTON CO LINE · County 059, Tennessee · Built 1988 · 2 Lanes · 12,379 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
30SR0340027
Year Built
1988
Length
65.5 m (214.9 ft)
Max Span
16.8 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
12,379
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.