FAP 43 299193E over I.C.G. RAILROAD

2.8 MI.S.OF MILAN · County 053, Tennessee · Built 1969 · 2 Lanes · 13,471 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
27SR0430004
Year Built
1969
Length
65.5 m (214.9 ft)
Max Span
22.4 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
13,471
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,522,000
Total Project Cost
$2,284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.