FAP 43 299193E over I.C.G. RAILROAD
2.8 MI.S.OF MILAN · County 053, Tennessee · Built 1969 · 2 Lanes · 13,471 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.851075, -88.751228
This bridge is in worse condition than 80.6% of bridges in County 053. The average bridge in Tennessee is 0 years old; this one is 57 years old.
Nearby Bridges
FAP 43 299193E over I.C.G. RAILROAD
Built 1989
NFA A649 over N FORK OF FORKED DEER
Built 2014
NFA A648 over BR OF OLIVER BRANCH
Built 1998
NFA A648 (SA 2731) over N FORK OF FORKED DEER
Built 1995
FAS 187 over N FORK OF FRKD DEER RIVE
Built 1986
FAS 187 over CLEAR CREEK
Built 1986
FAS 187 over BR OF OLIVER BRANCH
Built 1986
FAP 43 over CLEAR CREEK
Built 1975
FAP 43 over BRANCH
Built 1990
NFA 880 over BRANCH
Built 1925
Bridge Details
- Structure #
- 27SR0430004
- Year Built
- 1969
- Length
- 65.5 m (214.9 ft)
- Max Span
- 22.4 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 13,471
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,522,000
- Total Project Cost
- $2,284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.