FAP 43 299193E over I.C.G. RAILROAD

2.8 MI S OF MILAN · County 053, Tennessee · Built 1989 · 2 Lanes · 13,471 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
27SR0430003
Year Built
1989
Length
73.2 m (240.2 ft)
Max Span
25.3 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
13,471
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.