FAP 15 over BOILING FORK CREEK

NEAR WINCHESTER CITY LM. · County 051, Tennessee · Built 1937 · 2 Lanes · 6,559 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
26SR0150015
Year Built
1937
Length
39.3 m (128.9 ft)
Max Span
13.1 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
6,559
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$509,000
Total Project Cost
$764,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.