NFA 2127 (SA 2609) over BOILING FORK CREEK

SOUTH OF US64 · County 051, Tennessee · Built 1960 · 2 Lanes · 1,122 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
26021270001
Year Built
1960
Length
32.2 m (105.6 ft)
Max Span
13.8 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
1,122
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$297,000
Total Project Cost
$446,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.