NFA A009 over JIM GARRETT RD / I-40

1.1 MI FROM SR24 · County 035, Tennessee · Built 1964 · 2 Lanes · 290 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
18I00400007
Year Built
1964
Length
86 m (282.2 ft)
Max Span
18.9 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
290
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,230,000
Total Project Cost
$1,846,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.