FAP 401 (SR 24) over SR 24 / I40
1 MI CUMBELAND PUTNAM CL · County 141, Tennessee · Built 1965 · 2 Lanes · 2,882 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
36.113461, -85.243544
This bridge is in worse condition than 98.2% of bridges in County 141. The average bridge in Tennessee is 0 years old; this one is 61 years old.
Nearby Bridges
I40 over SR 24
Built 1963
I40 over SR 24
Built 1963
NFA A001 over I40
Built 1964
FAP 62 over OFFICE BRANCH
Built 1953
I40 over STAMPS HOLLOW CREEK
Built 1963
NFA A409 over STAMP HOLLOW CREEK
Built 1982
I40 over I40 WB / SR 24
Built 1963
I40 over I40 / SR 24
Built 1963
FAP 62 over DRIPPING SPRINGS CREEK
Built 1974
I40 over I40 / SR 24
Built 1963
Bridge Details
- Structure #
- 71I00400057
- Year Built
- 1965
- Reconstructed
- 1986
- Length
- 103.3 m (338.9 ft)
- Max Span
- 24.1 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,882
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,080,000
- Total Project Cost
- $3,121,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.