FAP 73 over PIGEON RIVER

0.5 MI. W. OF I40 · County 029, Tennessee · Built 1967 · 2 Lanes · 2,861 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
15025720001
Year Built
1967
Reconstructed
2017
Length
149 m (488.8 ft)
Max Span
20.6 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
2,861
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,866,000
Total Project Cost
$4,300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.