NFA 2515 (SA 1501) over INDIAN CAMP CREEK

1 MI WEST OF COSBY · County 029, Tennessee · Built 2008 · 2 Lanes · 494 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
15025150009
Year Built
2008
Length
14.1 m (46.3 ft)
Max Span
4.3 m
Width
17.1 m (56.1 ft)
Lanes
2
Daily Traffic
494
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.