FAP 52 over NEW HOPE CREEK

2.36 MI.W.OF CELINA · County 027, Tennessee · Built 1999 · 2 Lanes · 3,562 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
14SR0520007
Year Built
1999
Length
20.1 m (65.9 ft)
Max Span
5.5 m
Width
17.2 m (56.4 ft)
Lanes
2
Daily Traffic
3,562
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.