FAP 1 over BRANCH

1.5 MI.N.OF HOLLOW ROCK · County 017, Tennessee · Built 1950 · 2 Lanes · 5,231 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
09SR0010027
Year Built
1950
Length
9.8 m (32.2 ft)
Max Span
3 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
5,231
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$221,000
Total Project Cost
$332,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.