FAS 114 over CHERRY CREEK

N.OF HOLLOW PARK · County 017, Tennessee · Built 1955 · 2 Lanes · 809 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
09S80240015
Year Built
1955
Length
10.4 m (34.1 ft)
Max Span
3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
809
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$61,000
Total Project Cost
$92,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.