FAP 35 over BROWN CREEK

2.5 SW OF MARYVILLE · County 009, Tennessee · Built 1923 · 2 Lanes · 11,231 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
05SR0350007
Year Built
1923
Length
13.6 m (44.6 ft)
Max Span
5.4 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
11,231
Material
Concrete
Design
Mixed Types
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,000
Total Project Cost
$31,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.