FAU 33 over FAU 4442 & PISTOL CREEK

2.7 M S OF MARYVILLE · County 009, Tennessee · Built 2006 · 3 Lanes · 8,747 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
05SR0330005
Year Built
2006
Length
91.7 m (300.9 ft)
Max Span
36.9 m
Width
14.9 m (48.9 ft)
Lanes
3
Daily Traffic
8,747
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$885,000
Total Project Cost
$1,328,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.