32050 475TH AVE over DRAINAGE DITCH

1W & 3.5N ELK POINT · County 127, South Dakota · Built 1993 · 2 Lanes · 45 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

42.744386, -96.707664

This bridge is in worse condition than 66.3% of bridges in County 127. The average bridge in South Dakota is 0 years old; this one is 33 years old.

Nearby Bridges

Bridge Details

Structure #
000000064050235
Year Built
1993
Length
19.7 m (64.6 ft)
Max Span
19.4 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
45
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$17,000
Total Project Cost
$25,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.