32200 477TH AVE over LEWIS DITCH

1E & 2N ELK POINT · County 127, South Dakota · Built 1968 · 2 Lanes · 40 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
4
Poor
Superstructure
4
Poor
Substructure
3
Serious

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 4 Poor
Substructure 3 Serious

Location

42.722106, -96.665486

This bridge is in worse condition than 88.2% of bridges in County 127. The average bridge in South Dakota is 0 years old; this one is 58 years old.

Nearby Bridges

Bridge Details

Structure #
000000064070250
Year Built
1968
Length
19.1 m (62.7 ft)
Max Span
9.4 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
40
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$17,000
Total Project Cost
$25,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.