SC 174 over SAND CREEK

9 MI N OF EDISTO BEACH · County 019, South Carolina · Built 2020 · 2 Lanes · 5,400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000010349
Year Built
2020
Length
67.1 m (220.1 ft)
Max Span
15.2 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
5,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$134,000
Total Project Cost
$201,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.