SC 174/HIGHWAY 174 over STORE CREEK
4 MI N OF EDISTO BEACH · County 019, South Carolina · Built 2018 · 2 Lanes · 5,400 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
32.558753, -80.279861
This bridge is in worse condition than 43.1% of bridges in County 019. The average bridge in South Carolina is 0 years old; this one is 8 years old.
Nearby Bridges
Bridge Details
- Structure #
- 000000000010179
- Year Built
- 2018
- Length
- 54.9 m (180.1 ft)
- Max Span
- 9.1 m
- Width
- 14.4 m (47.2 ft)
- Lanes
- 2
- Daily Traffic
- 5,400
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.