SC 153 EXTENSION over NORFOLK SOUTHERN RR

3.9MI NE OF EASLEY · County 077, South Carolina · Built 2020 · 2 Lanes · 10,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000010274
Year Built
2020
Length
34.4 m (112.9 ft)
Max Span
34.4 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
10,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.