C-39-1854 over CRAYTON CREEK

5.6 MI E OF EASLEY · County 077, South Carolina · Built 2007 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000010241
Year Built
2007
Length
9.1 m (29.9 ft)
Max Span
9.1 m
Width
4.6 m (15.1 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$97,000
Total Project Cost
$146,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.