S-23-23 over I-385
6.3 MI E OF GREENVILLE · County 045, South Carolina · Built 1980 · 2 Lanes · 150 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
34.814953, -82.289483
This bridge is in worse condition than 62.3% of bridges in County 045. The average bridge in South Carolina is 0 years old; this one is 46 years old.
Nearby Bridges
SC 146 over I-385
Built 1981
RAMP ON I-385 over RAMP OFF I-385 CD 5606
Built 2019
S-23-107 over I-385
Built 1980
I-385 NB over S-23-564 & RR CPDR
Built 2019
I-385 SB over S-23-564 & RR CPDR
Built 2019
RAMP OFF I-385 NB over S-23-564 & CPDR
Built 2019
S-23-333 over TRIB TO ROCKY CREEK
Built 1998
S-23-325 over GILDER CREEK
Built 1964
RAMP OFF I-385 SB over I-85
Built 2019
SC 146 over I-85
Built 1987
Bridge Details
- Structure #
- 000000000010061
- Year Built
- 1980
- Length
- 83.2 m (273 ft)
- Max Span
- 28.7 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 150
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.