RAMP OFF I-385 NB over S-23-564 & CPDR
6 MI SE OF GREENVILLE · County 045, South Carolina · Built 2019 · 2 Lanes · 12,550 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
34.828056, -82.293056
This bridge is in worse condition than 13.2% of bridges in County 045. The average bridge in South Carolina is 0 years old; this one is 7 years old.
Nearby Bridges
I-385 SB over S-23-564 & RR CPDR
Built 2019
I-385 NB over S-23-564 & RR CPDR
Built 2019
RAMP ON I-385 over RAMP OFF I-385 CD 5606
Built 2019
SC 146 over I-385
Built 1981
RAMP OFF I-385 SB over I-85
Built 2019
I-385 over I-85
Built 2019
RAMP OFF I-385 SB over I-85
Built 2019
I-85 BRIDGE RAMP over I-385 &I-85
Built 2019
RAMP OFF I-85 NB over I-85
Built 2019
RAMP OFF I-85 SB over RAMP ON I-85 SB
Built 2019
Bridge Details
- Structure #
- 000000000010411
- Year Built
- 2019
- Length
- 61.4 m (201.4 ft)
- Max Span
- 32.3 m
- Width
- 15 m (49.2 ft)
- Lanes
- 2
- Daily Traffic
- 12,550
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.