C-23-6052 over REEDY RIVER

WOODLAND WAY · County 045, South Carolina · Built 1960 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 7 Good

Location

34.841108, -82.385261

This bridge is in worse condition than 76.7% of bridges in County 045. The average bridge in South Carolina is 0 years old; this one is 66 years old.

Nearby Bridges

Bridge Details

Structure #
000000000003312
Year Built
1960
Reconstructed
2015
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$284,000
Total Project Cost
$426,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.