S-23-76 over REEDY RIVER

CITY GREENV-CLEVELAND ST · County 045, South Carolina · Built 1929 · 2 Lanes · 5,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 5 Fair

Location

34.841047, -82.396997

This bridge is in worse condition than 76.7% of bridges in County 045. The average bridge in South Carolina is 0 years old; this one is 97 years old.

Nearby Bridges

Bridge Details

Structure #
000000000000344
Year Built
1929
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
5,300
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$635,000
Total Project Cost
$953,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.