S-23-80 over REEDY RIVER

CITY GREENV-HUDSON ST · County 045, South Carolina · Built 1928 · 2 Lanes · 900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 5 Fair
Substructure 5 Fair

Location

34.849722, -82.410181

This bridge is in worse condition than 76.7% of bridges in County 045. The average bridge in South Carolina is 0 years old; this one is 98 years old.

Nearby Bridges

Bridge Details

Structure #
000000000000289
Year Built
1928
Length
12.2 m (40 ft)
Max Span
12.2 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$191,000
Total Project Cost
$287,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.