L-23-851 over SOUTHERN RR

GREENVILLE (QUEEN ST.) · County 045, South Carolina · Built 1918 · 2 Lanes · 250 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
000000000000097
Year Built
1918
Length
49.3 m (161.7 ft)
Max Span
18.5 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
250
Material
Concrete Continuous
Design
Girder and Floorbeam System
Owner
Railroad
Last Inspected
N/A
Est. Improvement
$517,000
Total Project Cost
$776,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.