I-195 EB & WB over PROVRIVER SOMAIN&SOWATER
PROVIDENCE EXIT 1 · County 007, Rhode Island · Built 2007 · 8 Lanes · 167,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
41.815347, -71.401844
This bridge is in worse condition than 9.4% of bridges in County 007. The average bridge in Rhode Island is 0 years old; this one is 19 years old.
Nearby Bridges
I-195 EB & WB over SOUTH MAIN STREET
Built 2008
POINT ST over PROVIDENCE RIVER
Built 1927
I-195 RAMP WN over EDDY ST & ALLENS AV
Built 2009
RMP SE-95S TO 195E over I95 RMPNP&WS US1 EDDY ST
Built 2009
I-195 RAMP EI over I-195 RAMP SME
Built 2009
RAMP NP over RAMP WN RAMP SE EDDY ST
Built 2009
I-95 NB&SB over EDDY ST
Built 1961
I-95 N TO I-195 E over US 1 & BLACKSTONE STREET
Built 2008
RAMP WP over GLOBE ST & HOSPITAL ST
Built 2009
I-95 NB & SB over BLACKSTONE ST
Built 2018
Bridge Details
- Structure #
- 000000000010810
- Year Built
- 2007
- Length
- 376.5 m (1235.2 ft)
- Max Span
- 121.9 m
- Width
- 50.9 m (167 ft)
- Lanes
- 8
- Daily Traffic
- 167,300
- Material
- Steel
- Design
- Arch - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $8,337,000
- Total Project Cost
- $21,675,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.