I-95 NB&SB over EDDY ST
1.0 MI S OF JCT I-195 · County 007, Rhode Island · Built 1961 · 8 Lanes · 52,688 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.812831, -71.406922
This bridge is in worse condition than 55.2% of bridges in County 007. The average bridge in Rhode Island is 0 years old; this one is 65 years old.
Nearby Bridges
RMP SE-95S TO 195E over I95 RMPNP&WS US1 EDDY ST
Built 2009
RAMP NP over RAMP WN RAMP SE EDDY ST
Built 2009
I-195 RAMP WN over EDDY ST & ALLENS AV
Built 2009
I-95 N TO I-195 E over US 1 & BLACKSTONE STREET
Built 2008
RAMP WP over GLOBE ST & HOSPITAL ST
Built 2009
I-95 NB & SB over BLACKSTONE ST
Built 2018
I-195 W TO EDDY ST over BLACKSTONE ST.
Built 2009
I-195 W TO I-95 SB over RAMP SE US 1 I-95 NB&SB
Built 2009
RAMP PS over RAMP SE & RAMP SES
Built 2010
I-195 EB & WB over PROVRIVER SOMAIN&SOWATER
Built 2007
Bridge Details
- Structure #
- 000000000005370
- Year Built
- 1961
- Reconstructed
- 1982
- Length
- 34.7 m (113.8 ft)
- Max Span
- 29.7 m
- Width
- 45.8 m (150.3 ft)
- Lanes
- 8
- Daily Traffic
- 52,688
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,684,000
- Total Project Cost
- $25,178,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.