CLIFFORD ST over RAMP SE I-95 RAMP PN

0.25 MI N OF POINT ST · County 007, Rhode Island · Built 2010 · 2 Lanes · 5,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000010800
Year Built
2010
Length
112.1 m (367.8 ft)
Max Span
55 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
5,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,443,000
Total Project Cost
$11,551,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.