RAMP CB over RAMP CC

0.1 MI W OF JCT I-95 · County 007, Rhode Island · Built 1988 · 1 Lanes · 22,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000005810
Year Built
1988
Length
76.2 m (250 ft)
Max Span
29.9 m
Width
9 m (29.5 ft)
Lanes
1
Daily Traffic
22,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,183,000
Total Project Cost
$10,877,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.