MIDDLE RD over RI 4
0.3 MI E OF JCT RI 2 · County 003, Rhode Island · Built 1969 · 2 Lanes · 7,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.646075, -71.487622
This bridge is in worse condition than 56.5% of bridges in County 003. The average bridge in Rhode Island is 0 years old; this one is 57 years old.
Nearby Bridges
RI 403 over RI 4 RAMPS 4I & 4G
Built 2006
RI 401 DIVISION ST over RI 4
Built 2022
RI 402 RAMP-G over RAMP 4D FROM RI 4 TO 403
Built 2008
RI 402 FRNCHTWN RD over RAMP D FROM RI 4 TO 403
Built 2008
RI 402 FRNCHTWN RD over RAMP 4E TO RI 402 RI 4
Built 1973
RI 402 FRNCHTWN RD over HUNT RIVER
Built 1928
RI 403 over FRENCHTOWN ROAD
Built 2008
US 1 POST RD SB over HUNT RIVER
Built 1964
US 1 POST RD NB over HUNT RIVER
Built 1930
ADIRONDACK DRIVE over FRENCHTOWN BROOK
Built 1980
Bridge Details
- Structure #
- 000000000007610
- Year Built
- 1969
- Length
- 73.2 m (240.2 ft)
- Max Span
- 19.8 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 7,300
- Material
- Steel Continuous
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $16,554,000
- Total Project Cost
- $43,041,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.