US 1 POST RD SB over HUNT RIVER

0.1 MI N OF JCT RI 402 · County 009, Rhode Island · Built 1964 · 2 Lanes · 8,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000000060
Year Built
1964
Length
11.9 m (39 ft)
Max Span
9.8 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
8,000
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$921,000
Total Project Cost
$2,394,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.