I-295 RAMP over PAWTUXET RIVER

1.4 MI N OF JCT I-95 · County 003, Rhode Island · Built 1966 · 2 Lanes · 10,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000007230
Year Built
1966
Length
52.2 m (171.3 ft)
Max Span
23 m
Width
18 m (59.1 ft)
Lanes
2
Daily Traffic
10,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,724,000
Total Project Cost
$14,882,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.