RI 2 NB BLD HLL RD over PAWTUXET RIVER

0.2 MI N OF JCT RI 113 · County 003, Rhode Island · Built 1967 · 3 Lanes · 25,453 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000004900
Year Built
1967
Length
31.9 m (104.7 ft)
Max Span
18.6 m
Width
14.9 m (48.9 ft)
Lanes
3
Daily Traffic
25,453
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,902,000
Total Project Cost
$7,544,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.