US 1 BROADWAY over I-95 NB & SB

1.0 MI S OF MASS LINE · County 007, Rhode Island · Built 1964 · 2 Lanes · 9,700 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000000005580
Year Built
1964
Reconstructed
2006
Length
63.2 m (207.3 ft)
Max Span
31 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
9,700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,876,000
Total Project Cost
$17,878,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.