EXCHANGE ST over I-95 NB & SB

0.4 MI S OF MASS. LINE · County 007, Rhode Island · Built 1958 · 2 Lanes · 16,040 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000005570
Year Built
1958
Reconstructed
2005
Length
36.3 m (119.1 ft)
Max Span
17.8 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
16,040
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,239,000
Total Project Cost
$8,422,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.