CHARLESTOWN BCH RD over PERRY CREEK

1.0 MI S OF JCT RI 112 · County 009, Rhode Island · Built 1986 · 2 Lanes · 1,541 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000003760
Year Built
1986
Length
17.3 m (56.8 ft)
Max Span
8.4 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
1,541
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,227,000
Total Project Cost
$3,190,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.