MILL ST over SLEEPY HOLLOW RESERVOIR

0.3 MI E OF JCT RI 114 · County 007, Rhode Island · Built 1983 · 2 Lanes · 8,686 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000003020
Year Built
1983
Length
22.9 m (75.1 ft)
Max Span
21.3 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
8,686
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,788,000
Total Project Cost
$4,649,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.