I-95 NB over ROOSEVELT AV

0.3 MI S OF MASS LINE · County 007, Rhode Island · Built 2020 · 3 Lanes · 42,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000005625
Year Built
2020
Length
25.9 m (85 ft)
Max Span
25.3 m
Width
16.8 m (55.1 ft)
Lanes
3
Daily Traffic
42,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,644,000
Total Project Cost
$6,874,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.